The vehicle hall and the hose tower were built in their present form in 1973 with two parking spaces for the fire brigade’s emergency vehicles. The existing building has now undergone extensive renovation.
Among other things, damage to the façade was repaired and windows replaced.
The roof of the extension was extensively greened in view of the rainwater volumes, and the façade was insulated with a composite thermal insulation system.
The property is located in the district of Nuremberg-Fischbach on Bregenzer Straße 23, 90475 Nuremberg.
The planned fire brigade equipment building is classified as a public non-residential building and built according to the current requirements of the EnEV (EnEV 2014, requirements for modernisations and new buildings) and the EEWärmeG (Renewable Energies Heat Act).
Total area | 494 m² |
Parking spaces | 4 |
Total costs | €1.5 million |
Start of construction | May 2020 |
Completion of construction | December 2021 |
Building owner | City of Nuremberg, represented by WBG KOMMUNAL GmbH, Nuremberg |
Architects | Eis Architekten GmbH, Bamberg |
Technical building services planning | HDH Nürnberg GmbH, Nuremberg |
Structural planning | Rührschneck und Habelt Büro für Ingenieurbau GmbH, Leutershausen |
SIGEKO | Dipl. Ing. (FH) Wolfgang Then, Nuremberg |
Architectural acoustics | ING+ARCH Partnerschaft mbH, Ehingen |
Ground investigation | Dr. Ing. Spotka und Partner GmbH, Postbauer-Heng |
Visualisation by Architekturbüro Teuber & Korder