The sports hall, with a total area of approx. 91 metres x 55 metres, is intended for ball sports such as basketball, handball, volleyball or futsal, as well as for other sports such as wrestling or rhythmic gymnastics.
In addition, the hall is also used for cultural purposes. There is room for up to 4,000 people. The two functional buildings, each measuring 33 metres x 16 metres, provide space for professional dressing rooms, changing rooms, press conference room, catering area, administration, warm-up hall, etc.
The sports hall is located in the north-west of Nuremberg. On Dr.-Ingeborg-Bausenwein-Straße 1.
Gross floor area | 25,000 m² |
Start of construction | April 2020 |
End of construction | End of 2020 |
Total costs | Approx. €39 million |
Building owner | City of Nuremberg, represented by WBG KOMMUNAL, Nuremberg |
General contractor | Nüssli Deutschland GmbH, Roth |
The City of Nuremberg, through WBG KOMMUNAL, is building a multifunctional sports hall on the site at Am Tillypark 9.
Video by Stefan Zillig-Meißner, wbg Nürnberg GmbH