New construction Kindergarden Erasmusstraße

Project description

The existing two-group kindergarten in the single-storey building on Elsa-Brändström-Straße must be renovated and no longer meets current educational requirements. It will thus be replaced by a new building with four kindergarten groups for a total of up to 100 children. An additional preparatory school (“Schulvorbereitende Einrichtung”, SVE) with four groups for up to 40 children complements the kindergarten and is also intended to support children with special educational needs. The kindergarten and SVE will work together closely and enable the implementation of a model project for “all-day SVE”. 

The new day-care centre on Erasmusstraße 13 has a gross floor area of 1,862 m² and a gross volume of 6,786 m³. The new day-care centre will be built in parallel with the new primary school building on Erasmusstraße 11, which in turn is an extended new replacement building for the Henry-Dunant-Schule. The new day-care centre is a compact building in the second row on Erasmusstraße and has three floors. The building is intended to form an integrative facility.
Both the independent kindergarten and the regular SVE will have a common entrance to the shared forecourt.

The new three-storey building is planned without a basement and in solid construction (walls and ceilings support the new building). The exterior walls are load-bearing and will be clad with a rear-ventilated (façade has a distance to the load-bearing wall to protect against mould), curtain wall façade made of white, perforated corrugated sheet metal. Furthermore, good building services equipment (local heating connection to the school, main and ancillary rooms with ventilation systems, ventilation unit on the roof, distribution kitchen for 100 places) and standard furnishings/facilities are planned.

Location

The new building is located in the district of Großreuth bei Schweinau. 

Special features

The new building, which is planned to be accessible barrier-free in accordance with DIN standards, has exclusively ground level access. The entire building is accessible via a lift. A WC on the ground floor is handicapped-accessible.

Facts

Gross floor area 1.574 m²
Total costs € 9,3 million
Start of construction 3 / 2023
End of construction 12 / 2024
Architect Hrycyk Architekten GmbH
Landscape architect Freiraumplanung Mrachacz
ELT / Elevator / MSR MTM-Plan GmbH
Heeting / ventilation / Sanitary Hubert + Freihart Ingenieure
Bauphysik Ingenierubüro Seidel
Statics Leonhardt, Andrä und Partner Beratende Ingenieure VBI AG