New construction Eduard­straße

Project description

The project involved the construction of two buildings with a total of 18 residential units, which were planned according to the requirements of income-oriented subsidies.
The two three-storey buildings have no basement. All flats on the ground floor are barrier-free. The houses can optionally be retrofitted with lifts.

Location

The building is located in the west of Nuremberg in the district of Höfen, near Leyher Straße.

Energy standard

The building meets the 2014 EnEV standard. This regulation addresses the energy properties of a new building, such as thermal insulation. This is intended to save heating costs, among other things.

Special features

The tenants have access to spare basement rooms, which are located at ground level between the two buildings in the outdoor facilities.

The central technical room for both buildings is also located at ground level in the outdoor facilities.

Facts

Residential units

Subsidised

18

Parking spaces

  9 

Living space

1,163 m²

Total costs

€3.475 million

Start of construction

June 2016

Available

July 2017

Building owner

WBG Nürnberg Beteiligung GmbH

Project management

wbg Nürnberg GmbH, Architektur & Städtebau, Matthias Fleischmann

Architect

wbg Nürnberg GmbH, Architektur & Städtebau

Technical building services planning

ingenieurteam plansache GmbH, Nuremberg

 

Structural planning

PYLON7 Ingenieure im Bauwesen, Nuremberg

 

Open spaces

Planungsbüro für Garten- und Außenanlagen Bernd Kounovsky, Nuremberg

 

Building physics

BASIC Gesellschaft für Bauphysik Akustik Sonderingenieurwesen Consultance mbh, Gundelsheim

 