Modernisation Hermann­straße 28 & Nelken­straße 17

Project description

The two buildings from 1939 have been modernised. There are 8 flats on Hermannstraße and 11 flats on Nelkenstraße.
The façades were water-blasted, re-plastered and painted. The original wooden shutters were replaced by aluminium shutters.
Both staircases have been repainted.

The plain tile roofing was replaced and the roof truss was partially repaired. 5 chimneys were demolished.
The staircase banisters and the uppermost windows were raised.
All flats received new radiators and new electrical supply lines.

Location

Hermannstraße and Nelkenstraße are located in the St. Leonhard district.

Special features

The modernisation was carried out in the occupied state. Some were still heated with coal stoves.

Facts

Residential units

19

Living space

2,384 m²

Total costs

€1 million

Year of construction

1939

Modernisation

March 2019 - October 2019

Planning and colour concept

wbg Nürnberg GmbH, Architektur & Städtebau, Achim Schirmeister

EL planning

wolf+albrecht GbR, Nuremberg

HLS planning

VIP Versorgungstechnik - Ingenieur- und Planungsgesellschaft mbH, Nuremberg

Structural planning

Trafektum, Nuremberg

This project is supported with the funds from the CEB