Modernisation Kiesling­straße 50-58

Project description

As part of the series of modernisations of the core housing complex at the Nordostbahnhof railway station, the five existing buildings dating from 1955 with a total of 50 flats were comprehensively modernised to make them more energy-efficient in 2021 (reduction of energy consumption).
In addition to the energy measures of façade insulation, window renovation, the installation of basement ceiling insulation and the replacement of the heating system with a modern district heating system, the roofing was replaced, the staircases and building entrances were renovated and new balconies were added to all flats.
The measures were rounded off with the restoration and partial redesign of the outdoor facilities.

Location

The buildings are located in the north-eastern area of the Nordostbahnhof core housing complex. This area of the housing complex is not subject to ensemble protection.

Energy standard

After implementation of the measure, the buildings meet the KfW100 standard. The modernised houses now consume the same amount of energy as a new building.

Special features

The measure was carried out in an occupied building.

Facts

Residential units

50 (privately financed)

Parking spaces

In the open area

Living space

3,200 m² (incl. living space of new balconies)

Total costs

Approx. €4 million

Start of construction

March 2021

Completion

November 2021

Project management

wbg Nürnberg GmbH, Architektur & Städtebau, Mr Baudisch

Architect

Ramstötter Dinkelmeyer Architekten GmbH, Nuremberg

Technical building services planning

VIP Versorgungstechnik, Nuremberg

Structural planning

Ingenieurbüro Schrittesser, Nuremberg

Open spaces

Planungsbüro Kounovsky, Nuremberg

Building physics

Ramstötter Dinkelmeyer Architekten GmbH, Nuremberg

Photos by Dirk Baudisch (wbg Nürnberg)

This project is supported with the funds from the CEB