Modernisation Reinerzer Straße 20-22

Project description

The ground floor flats were provided with a tenant garden and access to the tenant garden was realised via a staircase on the balcony. In addition, the lift was upgraded and now stops on the intermediate landing. 
The outer doors of the buildings and the basement were renovated. The central hot water supply via district heating was converted. The heating devices, the electrical and water risers, as well as the waste water downpipes were renovated. 

In addition, the house connections and supply lines as well as the sewage base lines were checked (sewer check). The staircase was renovated and as a result the walls were repainted and the banisters were renovated. The basements were repainted. In addition, lighting and power sockets were installed for each basement compartment.

Location

Reinerzer Straße is located in the Langwasser district.

Special features

The modernisation was carried out in the occupied state.

Facts

Residential units

20 + 4

Living space

2,384 m²

Total costs

€1 million

Modernisation

03/20 - 04/21

Planning

Raumstötter Dinkelmeyer Architekten GmbH, Nuremberg

Open spaces

GRABNER HUBER LIPP LANDSCHAFTSARCHITEKTEN

Fire protection

TEUCKE INGENIERUBÜRO Brandschutz, Tragwerk, Sicherheit, Nuremberg

This project is supported with the funds from the CEB