New construction Reinerzer Straße 28a

Project description

As on Reinerzer Straße 28a, a standardised new building in timber hybrid construction is being built here. The new building has a flat roof and the façade is made of wood.

Location

Reinerzer Straße 28a in Nuremberg Langwasser Southeast, as urban consolidation within the framework of the district concept. Thus, vacant building areas are being used for the development. 

Energy standard

The new building is being constructed according to the KfW 55 standard. This means that the new building requires only 55% of the energy that a conventional house needs. The apartment building is therefore also particularly environmentally friendly. 

Special features

Natural ventilation through large-volume ventilation shafts.
The new apartment building is being built as a timber hybrid construction as a continuation of the wbg standardised house.

Facts

Residential units

11

Living space

720 m²

Usable area

806 m²

Total costs

€2.7 million

Start of construction

August 2021

Available

September 2022

Project management

wbg Nürnberg GmbH, Architektur und Städtebau, Jan Pöpper

Architect

wbg Nürnberg GmbH, Architektur und Städtebau

Technical building services planning

ingenieurteam plansache GmbH, Schwabach

 

Structural planning

PIRMIN JUNG Deutschland GmbH, Remagen

 

Open spaces

Grabner Huber Lipp Landschaftsarchitekten und Stadtplaner Partnerschaft mbb, Freising

 

Building physics

Wolfgang Sorge Ingenieurbüro für Bauhysik GmbH & Co. KG, Nuremberg

PIRMIN JUNG Deutschland GmbH, Remagen