Modernisation Reinerzer Straße 77-83

Project description

The project primarily comprises maintenance measures:

  • Existing cracks and damaged areas in the façade are being renovated.
  • The outer shell is being given a new coat of paint. 
  • The old existing windows will be replaced with plastic windows (only if necessary after inspection). 
  • The staircase will be renovated, and the basement common area will also receive a new coat of paint. Lighting and a power socket are to be installed in each basement compartment. Renovation of the basement exit and the outside area analogous to Reinerzer Straße 69-75
  • The electrical risers and electrical flat distributors, which are no longer state of the art, will be renovated. In addition, the gas pipes and the gas house connection will be dismantled and the gas instantaneous water heaters will be replaced by electric instantaneous water heaters for the WWB.
  • The outdoor facilities (paths, green areas, drainage tiles, bicycle stands, waste bins) will be restored.
  • The flats on the ground floor will have tenant gardens including garden water connection and system separation with submersible pump. In addition, it will be examined whether existing balconies require renovation (the renovation of the balconies concerns the existing balconies; additional new balconies will be added in the course of the modernisation). The existing balconies will be demolished and renovated as far as necessary. The balcony parapets are also being renovated; the costs are part of the TICs.

Location

Reinerzer Straße is located in the Langwasser core housing complex. 

Special features

The ground floor flats will have tenant gardens. 

Facts

Residential units

32

Living space

1,883 m²

Total costs

€2 million

Modernisation

Q1 2022 - Q4 2022