Modernisation Saalfelder Straße 6-10

Project description

In the series of modernisations of the core housing complex at the Nordostbahnhof railway station, the three existing buildings dating from 1955 with a total of 36 flats are being comprehensively modernised to make them more energy-efficient in 2023.

In addition to the energy measures of façade insulation, window renovation, the installation of basement ceiling insulation and the replacement of the heating system with a modern district heating system, the roofing is being replaced, the staircases and building entrances are being renovated and new balconies are being added to all flats.

The measures are rounded off with the restoration and partial redesign of the outdoor facilities.

Location

The buildings are located in the north-eastern area of the Nordostbahnhof core housing complex. This area of the housing complex is not subject to ensemble protection.

Energy standard

After implementation of the measure, the buildings meet the KfW Efficiency House 100 standard. This means that the modernised house consumes 100% of the annual primary energy of a comparable new building. It thus meets the standard of a new building.

Special features

The measure is being carried out in an occupied building.

Facts

Residential units 
Privately financed  

36
36

Living space

2,043 m²

Total costs

€3.4 million

Start of construction

March 2023

Available

December 2023

Project management

wbg Nürnberg GmbH, Architektur & Städtebau, Mr Baudisch

Architects

Ramstötter Dinkelmeyer Architekten GmbH, Nuremberg

Technical building services planning

VIP Versorgungstechnik, Nuremberg

Structural planning

Ingenieurbüro Schrittesser, Nuremberg

Open spaces

Planungsbüro Kounovsky, Nuremberg

Building physics

Ramstötter Dinkelmeyer Architekten GmbH, Nuremberg