New construction Großweidenmühlstraße

Project description

A care facility with EOF-subsidised senior flats and an underground car park is being built on this site. After a realisation competition has previously taken place, a total of 122 single-bed rooms, 15 day care places and 35 subsidised senior flats will be constructed, which will be located in the existing green area. The foyer and cafeteria open the house to the district and invites participation.

The new building consists of three connected square buildings. 

The area was formerly used as a garden. 

Location

The new building is located in the St. Johannis district. 

Energy standard

In the planning, particular importance has been attached to preserving the existing trees on the site. The buildings will also be equipped with groundwater heat pumps and a photovoltaic system (solar energy), thereby achieving the KfW Efficiency House 55EE level. This means that at least 55 % of the energy demand comes from renewable energies. 

Facts

Total area 9.600 m²
Total costs € 51 million
Start of construction 2024
End of construction 2026
Building owner WBG Nürnberg Beteiligungs GmbH
Drafter KÖPPEN RUMETSCH Architekten GmbH
Fire Protection TEUCKE INGENIEURBÜRO
Building physics Wolfgang Sorge Ingenieurbüro
Structural planning TRAGRAUM Ingenieure PartmbB
Technical building services Burnickl Ingenieure GmbH
Landscape architect koeber LANDSCHAFTSARCHITKETUR GmbH
Geothermical energy EBR - Alexander Eber