As part of the modernisations of the core housing complex at the Nordostbahnhof railway station, the five existing buildings dating from 1955 with a total of 50 flats are being comprehensively modernised to make them more energy-efficient in 2021.
In addition to the energy measures of façade insulation, window renovation, the installation of basement ceiling insulation and the replacement of the heating system with a modern district heating system, the roofing is being replaced, the staircases and building entrances are being renovated and new balconies are being added to all flats.
These measures should ensure that the energy consumption of the house is reduced in the future.
The measures are being rounded off with the reconstruction and partial redesign of the outdoor facilities.
The buildings are located in the north-eastern area of the Nordostbahnhof core housing complex.
This area of the housing complex is not subject to ensemble protection.
After implementation of the measure, the buildings meet the KfW100 standard. This means that after modernisation, no more than 100% of the energy consumption of a new building is used.
The measure is being carried out in an occupied building.
Residential units | 30 (privately financed) |
Parking spaces | In the open area |
Living space | 1,762 m² (incl. living space of new balconies) |
Total costs | Approx. €2.7 million |
Start of construction | March 2022 |
Completion | December 2022 |
Project management | wbg Nürnberg GmbH, Architektur & Städtebau, Mr Baudisch |
Architect | Ramstötter Dinkelmeyer Architekten GmbH, Nuremberg |
Technical building services planning | VIP Versorgungstechnik, Nuremberg |
Structural planning | Ingenieurbüro Schrittesser, Nuremberg |
Open spaces | Planungsbüro Kounovsky, Nuremberg |
Building physics | Ramstötter Dinkelmeyer Architekten GmbH, Nuremberg |
Photos by Dirk Baudisch (wbg Nürnberg)