New construction Züricher Straße Urban Center

Project description

WBG Nürnberg Beteiligungs GmbH is carrying out the “Urbanes Zentrum Züricher Straße” construction project at the corner of Züricher Straße and Gerhard-Hauptmann-Straße in the Großreuth neighborhood near Schweinau. The residential buildings will consist of five-, six-, and seven-story structures with a shared underground parking garage in the southern portion of the development site.  A visual highlight will be a green façade on one side of each building. A total of five residential buildings with 181 apartments are being constructed. The ground floors will provide space for commercial and public facilities, including retail, restaurants, and a daycare center with four preschool groups and two infant care groups. 

Of the total 181 apartments:

  • 82 are privately financed apartments (including 51 two-room apartments and 31 three-room apartments)
  • 50 are subsidized apartments for income bracket I (EOF I)*
  • 49 subsidized apartments for income levels II and III (EOF II and EOF III)* (including 4 one-room apartments, 18 two-room apartments, 17 three-room apartments, and 10 four-room apartments)

*All information regarding income limits for subsidized apartments can be found on the Website Stadt Nürnberg.

Are you interested in a privately financed apartment or an EOF-II or EOF-III apartment in the Züricher Straße Urban Center?
Fill out our „Wohnungswunsch“ form now. If a suitable apartment becomes available, we will contact you in early 2027. 

Are you interested in an EOF-I apartment?
The Nuremberg Social Services Office has the right to make recommendations. Please register directly with Wohnungsvermittlung der Stadt Nürnberg.

Location

Züricher Straße, 90431 Nürnberg
Westliche Außenstadt, Großreuth b. Schweinau

Energy standard

EH 55 / Solar Power System Under Construction

Special features

  • The property was transferred to WBG Beteiligungs GmbH as part of the contribution, in accordance with municipal objectives and criteria.

  • Due to difficulties with the building site, the original plan (water infiltration) had to be extensively redesigned.

  • A technically challenging project, particularly due to the construction of the subway line between the north and south construction sites (direct connection to the U3 right outside the front door).

  • Climate and sustainability measures (e.g., greening of the facades)

  • After the buildings are completed, the outdoor areas will be redeveloped, and numerous replacement plantings will be carried out along Gerhard-Hauptmann-Straße as well as on the construction site itself. 

Facts

Residential Units 181 (82 FF and 99 EOF)
Living Space 12.178 m²
Commercial Units 8 (1 daycare center, 1 club, 6 office and retail spaces)
Commercial Space / Usable Floor Area 2.597 m²
Underground Parking Spaces 136
Start of Construction 01/2025
Completion of Construction 05/2027
Total Costs 87.653.641 €
Project Management WBG Beteiligungs GmbH
Master Planner Hübsch + Harlé Architekten Stadtplaner PartGmbB
General Contractor

ARGE Urbanes Zentrum Nürnberg
Max Bögl Stiftung & Co.KG
GS Schenk Bauunternehmung GmbH

Video

Excavator push for the “Züricher Strasse Urban Center”